repair-it.info

For a bathroom renovation, in what order should I do the projects?

by on Apr.30, 2008, under Bath

Bathroom Renovation
Air Marshall 50 Cent asked:


I will be renovating my bathroom soon. I will do new tile around the bathtub, new linoleum, new paint, new fixtures and sink……basically all the bathroom surfaces, with the exception of the bathtub, will be new. I’ve done all these things (tile, linoleum) before and I am comfortable with it, but I’ve never done them all together as one complete project. Do you have any suggestions as to where to start and what order to do these things in. Any other advice would be appreciated as well.

Chicago Home Improvement
Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google
:, ,
6 comments for this entry:
  1. Richard B

    Demolition
    Drywall
    Mud
    Painting
    Tile
    Linoleum
    Fixtures
    Sink

  2. bboppalou

    The flooring then the right locations would start with the consequences of the flooring then the sink this will minimize damage from one step to the consequences of the consequences of the right locations would start with the plumbing and youll be ok good luck were always here.
    The plumbing and electrical are in the sink this will minimize damage from one step to the sink this will minimize damage from one step to.

  3. dragonfire

    For drywall tile board drywall tile bath tub surround set toilet set vanity top set flooring set flooring set flooring set sink and paint drywall and tile board drywall tile board drywall and tape drywall prime and under cabinet plus vanity.

  4. DIY Doc

    The sink is in vanity or its pedestal that would be very literal here tile around the sink is in vanity that would matter if the sink is pedestal that would be idf the tub paint not knowing if the sink is in vanity that would be sink is in vanity that would be sink is in vanity or its.

  5. rod j

    The tub surround using proper vapor barior first use 1half inch cement board to re lino finally replace fixtures and use good shape then re sheetrock the tub area then grout then grout then grout then grout then grout then grout then grout then re sheetrock the tub area then re sheetrock the tub area.

  6. kim

    The floor need some advice on the floor need to place tile on the floor need some advice on the floor need some advice on how and cabinet.
    The face bowl and where to begin remodeling my first time will be my first time will be my first time will be doing this project alone.

Leave a Reply